Assigning priorities to data for hybrid drives

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9323460
APP PUB NO 20150193147A1
SERIAL NO

14664411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid drive includes multiple parts: a performance part (e.g., a flash memory device) and a base part (e.g., a magnetic or other rotational disk drive). A drive access system, which is typically part of an operating system of a computing device, issues input/output (I/O) commands to the hybrid drive to store data to and retrieve data from the hybrid drive. The drive access system assigns, based on various available information, a priority level to groups of data identified by logical block addresses (LBAs). With each I/O command, the drive access system includes an indication of the priority level of the LBA(s) associated with the I/O command. The hybrid drive determines, based on the priority level indications received from the drive access system, which LBAs are stored on which part or parts of the hybrid drive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICROSOFT TECHNOLOGY LICENSING, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alexander, Robin A Woodinville, US 21 266
Bak, Yevgeniy M Redmond, US 36 410
Bluestein, Eric M Seattle, US 7 50
Herron, Andrew M Redmond, US 11 306
Iyigun, Mehmet Kirkland, US 113 2850
Xing, Xiaozhong Sammamish, US 11 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00