Optimized cold boot for non-volatile memory

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9323542
APP PUB NO 20140115315A1
SERIAL NO

13977081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments are directed to apparatuses and methods for faster solid state drive (SSD) boot-up. On boot-up, SSD control algorithms may load non-logical to physical (L2P) parts of a context and signal the system that the SSD is ready. The context may comprise various state data pertaining to the SSD. After signaling that the SSD may be ready to receive access requests, the SSD control algorithms may begin loading segments of the L2P table sequentially. Access to the L2P table may be blocked, however, when a requested segment has not yet been loaded. In such cases, the SSD control algorithms may then load the requested segment out of turn and then service the access request.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nayak, Suhas Portland, US 10 46
Ratn, Prasun Hillsboro, US 4 75
Royer,, Jr Robert J Portland, US 42 251
Trika, Sanjeev N Hillsboro, US 125 2217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00