Back gate single-crystal flexible thin film transistor and method of making

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9324872
APP PUB NO 20150243796A1
SERIAL NO

14624748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gate dielectric material and a gate conductor portion are formed on a single-crystal semiconductor material of a substrate. A dielectric structure is then formed surrounding the gate conductor portion and thereafter a stressor layer is formed on the dielectric structure. A controlled spalling process is then performed and thereafter a material removal process can be used to expose a surface of the single-crystal semiconductor material. A source region and a drain region are then formed on the exposed surface of the single-crystal semiconductor material, which exposed surface is opposite the surface including the gate dielectric.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bedell, Stephen W Wappingers Falls, US 409 5517
Hekmatshoartabari, Bahman White Plains, US 389 1807
Hovel, Harold John Katonah, US 14 81
Li, Ning White Plains, US 707 4047
Sadana, Devendra K Pleasantville, US 897 9891

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00