Web substrate having optimized emboss design

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9326646
APP PUB NO 20140242340A1
SERIAL NO

14269563

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fibrous structure having a total dry tensile strength of greater than about 59 g/cm and at least one embossed ply having a surface thereof is disclosed. The surface has a surface area comprising from about 10.0 percent to about 20.0 percent line embossments. Also, a fibrous structure having at least two plies is disclosed. One of the two plies has a total dry tensile strength of greater than about 59 g/cm and at least one embossed ply having a surface thereof. The surface has a surface area comprising from about 10.0 percent to about 20.0 percent line embossments.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE PROCTER & GAMBLE COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byrne, Thomas Timothy West Chester, US 84 617
Jones, Jason Merrill Lebanon, US 24 272
McNeil, Kevin Benson Cincinnati, US 146 2495
Mellin, André Amberley Village, US 41 389

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00