Process for the production of grain-oriented magnetic sheets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9328396
APP PUB NO 20130160897A1
SERIAL NO

13532545

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention has as objective a procedure for the oriented-grain magnetic sheet that provides particular operative hot rolling mill conditions of silicon steel slabs, by means which it is possible to highly contain the heterogeneities of hot rolled sheet re-crystallization. The use of these operative conditions permits to reduce the growing tendency of the crystallized grain during the annealing of the sheets at a final thickness that precedes the secondary oriented re-crystallization. Contemporarily, the particular operational conditions of hot rolling mill according to the invention permit a fine precipitation of secondary phases useful to the control of the grain growing, starting from a quantity of sulphur (S) and nitrogen (N) in matrix lower than corresponding provided by the conventional technologies and consequently disposable in metallic solid solution before the rolling after the heating of the slabs at temperature values lower than 1300° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRO SVILUPPO MATERIALI S P AVIA DI CASTEL ROMANO 100-102 ROMA 00129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbruzzese, Giuseppe Rome, IT 18 52
Cicale, Stefano Rome, IT 7 9
Fortunati, Stefano Rome, IT 21 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00