Kneading/extruding equipment with feedforward control of latter stage pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9333674
APP PUB NO 20130229888A1
SERIAL NO

13759448

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides kneading/extruding equipment capable of stable operation by keeping the pressure of kneaded material before a first-stage gear pump in steady operation (molding) and preventing fluctuation of the pressure of kneaded material before the first-stage gear pump constant from largely affecting the pressure of kneaded material before a latter-stage gear pump at start-up or upon change of production rate, and thus capable of responding to an increase in production rate while securing a high-quality molded product, and an operation control method thereof. The kneading/extruding equipment comprises: a rotational speed feedback control unit for a first gear pump, which feedback-controls the rotational speed of the first gear pump, and a rotational speed feedforward control unit for a second gear pump, which feedforward-controls the rotational speed of the second gear pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Satoshi Takasago, JP 136 2186
Asagiri, Shinichi Takasago, JP 1 5
Iritani, Kazuo Takasago, JP 12 120
Iwasaki, Shin Takasago, JP 19 17
Kuroda, Yoshinori Takasago, JP 18 132
Minami, Kayoko Takasago, JP 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00