Wavelength-shift composite light-storing powder and method of manufacturing and applying the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9334441
APP PUB NO 20140319422A1
SERIAL NO

13946139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wavelength-shift composite light-storing powder and method of manufacturing and applying the same. Wherein, inorganic metal oxide and light-storing material containing rare earth elements are made to collide at high speed in an environment of extremely low temperature. The collision process makes said inorganic metal oxide to produce fusion reaction on surface of said light-storing material, that causes changes of lattice structure, to generate photon shift phenomenon and produce said wavelength-shift composite light-storing powder. Said composite light-storing powder is apt to engage cross-linked structure of thermoplastic polymer in a high temperature blending process, to achieve even distribution. Finally, through a filament process to produce successfully light-storing fibers capable of emitting lights of various wavelengths, to raise its heat resistance and wash durability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN TEXTILE RESEARCH INSTITUTENEW TAIPEI CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsiao, Ying-Hsiu New Taipei, TW 8 10
Lin, Sheng-Jen New Taipei, TW 29 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00