Magnetic field generating device and offset calculating method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9335383
APP PUB NO 20150145625A1
SERIAL NO

14539440

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A magnetic field generating device includes a triaxial Helmholtz coil 3, amounting table 4 on which a portable device 2 is mounted, a current supplying part 5 and a controlling part 6. The current supplying part 5 supplies current I to individual three monoaxial Helmholtz coils 30 which construct the triaxial Helmholtz coil 3. The controlling part 6 changes the current flowing through the individual monoaxial Helmholtz coils 30 in such a manner that a synthetic magnetic field of a magnetic field generated within the triaxial Helmholtz coil 3 by the current I and an external magnetic field which acts from the outside into the triaxial Helmholtz coil 3 acts on a triaxial magnetic sensor 20 within the portable device 2 mounted on the mounting table 4 from a plurality of predetermined directions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AICHI STEEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukasawa, Masahiko Aichi, JP 2 36
Kambara, Ryuji Aichi, JP 1 15
Nakada, Masaaki Aichi, JP 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00