Semiconductor storage device and driving method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9336882
APP PUB NO 20140254254A1
SERIAL NO

14281433

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A memory includes a cell array including nonvolatile memory cells. A power generator generates a power supply voltage for driving the cell array. A receiver receives a command and an address. A controller controls an active state of the cell array, the power generator, and the receiver. In an activation mode, the cell array, the power generator, and the receiver are turned into the active states. In a first power saving mode, the cell array, the power generator, and the receiver are turned into inactive states. In a second power saving mode, the cell array and the power generator are turned into the active states, and the receiver is turned into the inactive state. In a third power saving mode, at least a part of the power generator is turned into the active state, and the cell array and the receiver are turned into the inactive states.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoya, Katsuhiko Yokohama, JP 60 362
Katayama, Akira Yamato, JP 153 2137
Ryu, Keiichi Kamakura, JP 1 9
Takagi, Yasuharu Chuo-ku, JP 3 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00