Ceramic substrate, and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9338897
APP PUB NO 20140166346A1
SERIAL NO

14133238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ceramic substrate is provided that includes a ceramic substrate main body including a principal surface, a connecting terminal portion disposed on the principal surface of the ceramic substrate main body that is capable of being connected to another component via solder, the connecting terminal portion including a copper layer and a coating metal layer covering a surface of the copper layer; a contact layer of titanium or chromium disposed between the ceramic substrate main body and the connecting terminal portion; and an intermediate layer disposed between the copper layer of the connecting terminal portion and the contact layer, the intermediate layer including one of a titanium-tungsten alloy, a nickel-chromium alloy, tungsten, palladium, and molybdenum. The contact layer and the intermediate layer are set back from a side surface of the copper layer in a substrate plane direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITERRA CO LTDNAGOYA-SHI AICHI 461-0005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukunaga, Kazunori Inuyama, JP 2 5
Otsuka, Yuma Komaki, JP 6 26
Uchida, Atsushi Kakamigahara, JP 53 735
Yoshimura, Kouhei Nagoya, JP 12 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00