Method for recycling a byproduct of the phosphate fertilizer industry, soil conditioner, and soil conditioner manufacturing process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9346718
SERIAL NO

14517628

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Industrial demand for hexafluorosilicic acid (H2SiF6) is often lower than the amount produced from fluoride recycling processes. One alternative for using this surplus is manufacturing a soil conditioner by neutralizing the hexafluorosilicic acid with calcium oxide (CaO) inside an open, Kullman type reactor. The reaction ensures alkalinity to the soil conditioner having a pH of about 10, moisture less than about 40%, phosphorus (P2O5) at about 2.5%, calcium at about 22%, about 0.5% magnesium, about 10% silicon (about 30% to 40% water-soluble), about 18% fluoride, neutralization power of about 5% to 15%, and total neutralization power of about 5% to 12%. The resulting product, called AgroSiCa, is easily manageable with very high contents of Ca and Si (total and soluble), and also contains Mg, P, Fe, Zn, and F. When applied to soil, it contributes to the supply of nutrients, provides a better root growth and improves the plants development.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALE FERTILIZANTES S ARODOVIA ESTRADA DA CANA KM 11 S/N° BAIRRO INDUSTRIAL DE UBERABA UBERABA - MG 38001-970

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guilherme, Luiz Roberto Lavras, BR 1 1
Pereira, Hamilton Seron Uberlândia, BR 2 1
Ramos, Silvio Júnio Lavras, BR 2 1
Ribeiro, Do Valle Lucas Alberth Itumirim, MG 2 1
Rodrigues, Sérgio Leite São Paulo, BR 2 1
Siqueira, José Oswaldo Belérn, BR 2 1
Tarso, De Souza Costa Enio Monte Carmelo, BR 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00