Method for controlling flow rate of attachment for construction equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9347467
APP PUB NO 20130255241A1
SERIAL NO

13991579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of controlling a flow rate of an attachment for construction equipment of the present disclosure, in which an engine and a pump are connected to a control device to which various control information according to equipment characteristics, user setting information from an instrument panel, engine rpm adjustment information through an engine control dial, or the like is inputted, and an attachment is connected to the pump so as to perform specific work, includes selecting, on the instrument panel, an attachment to perform work and an optimum engine rpm according to the attachment; adjusting the flow rate by controlling an angle of a swash plate of the pump; and adjusting additionally a supply flow rate of the attachment by resetting an engine rpm when adjustment to the flow rate is necessary while performing the attachment work.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTD489 INJUNG-RO DONG-GU INCHEON 22502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Seong Ho Incheon, KR 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00