Device for controlling gas supply to a burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9347665
APP PUB NO 20120115096A1
SERIAL NO

13319425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas supply control device for an apparatus, particularly a coking apparatus, includes timing means (20) and a first command means (12) for manually setting a an opening time interval of a safety valve of a gas tap (1), equipped with a second command means (6). In an installed condition of the control device (10), the command means (6, 12) are operable from outside the structure (7) of the apparatus, with the first command means (12) and the second command means (6) substantially rotating around one same axis, one independent from the other. The timing means (20) of the control device (10) belong to a functional unit (10a) which is coupled or configured for coupling with a portion of the body of the tap (2) which portion, in the above mentioned installed conditions, is located inside the structure (7) of the apparatus. The functional unit (10a) includes switch means (22), controllable by timing means for cutting off the electric current to a solenoid of the tap (1) at the end of a time interval set through the first command means (6), and hence causing the passage of the valve to the respective closed condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELTEK S.P.A.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colombo, Paolo Alessandria, IT 88 1081
Gadini, Costanzo Alessandria, IT 47 401

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00