Total release method for sample extraction in an energetic-beam instrument

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9349573
SERIAL NO

14797087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate located in an energetic-beam instrument has a region of interest to be extracted as a sample for further analysis. Cuts are made in the substrate to define a sample, and a stress-buffer layer is formed over the region of interest or adjacent to it. An isolating cut is made to separate the portion of the substrate containing the region of interest from the bulk substrate; however, the isolated area remains attached to the stress-buffer layer. An end-effector, such as the probe of a nano-manipulator, is attached to the stress-buffer layer, and the stress-buffer layer is cut to free the sample. The sample may then be attached to a holder by attachment of the stress-buffer layer thereto. Thus the sample is never at the same time connected directly and rigidly to two different objects that may move relatively to one another, creating undesirable stresses in the sample.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OXFORD INSTRUMENTS AMERICA INC300 BAKER AVE SUITE 150 CONCORD MA 01742

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amador, Gonzalo Dallas, US 41 702
Hartfield, Cheryl Plano, US 12 219
Kruger, Rocky Point, US 7 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00