Video pipeline with direct linkage between decoding and post processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9351011
APP PUB NO 20140146896A1
SERIAL NO

13687093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In general, in one aspect, a decode order for a group of picture (GOP) frame structure for a video stream is modified to include regenerated P frames. The modified decode order includes a regenerated P frame of a P frame decoded prior to a sequence of B frames after last B frame in the sequence of B frames and before next I or P frame. The frames are decoded in modified decode order by a decode engine. The decoded frames are post processed in a display order (only includes regenerated P frames and does not include initial P frames defined in the decode order) by a post processing engine. The post processing engine may ignore the initial P frames or the decode engine may not forward the initial P frames to the post processing engine. The post processed frames may be prepared for presentation by a display engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Scott W Folsom, US 17 101
Janus, Scott Rocklin, US 75 516
Nanda, Akshat El Dorado Hills, US 5 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00