Nacelle incorporating an element for connecting a lip and an acoustic attenuation panel together

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9352844
APP PUB NO 20120261521A1
SERIAL NO

13518041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft nacelle includes a first subassembly consisting of a pipe (112) channeling an airflow in the direction of an engine having a covering or panel (118) for acoustic treatment, including, from the inside to the outside, a reflecting layer (120), at least one cellular structure (122), and at least one acoustically resistive structure (124) forming the aerodynamic surface of the pipe (112), as well as a second subassembly consisting of a lip (116) and a front frame (126), characterized in that it includes at least one connection element (134) which is separate from the two subassemblies and connected to a portion of the pipe (112) and to a portion of the lip forming an extension of the portion of the pipe at different points so as to be capable of enabling a relative movement between the two subassemblies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIRBUS OPERATIONS SAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lalane, Jacques Saint Orens de Gameville, FR 45 392
Porte, Alain Colomiers, FR 168 2515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00