Building configuration and management system with reconfigurable building components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9353514
SERIAL NO

14515401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and techniques for building, maintaining, and/or renovating buildings using reconfigurable, intelligent, and/or communicating components and connectors are provided. These reconfigurable building components and connectors are configured to communicate with each other and with the internal structures and services of a building, using various protocols, for more efficient reconfiguration, management, and maintenance as well as safety. Examples provide a Building Configuration and Management System which provides a set of “smart” components, connectors, and protocols and a Building Control System that connects all internal building structures and services together in ways that allow them to communicate their location, state, and other information to each other and to other entities and to control them, potentially automatically. The BCMS facilitates, among other things, more efficient reconfiguration of these structures and services without demolition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IVP HOLDINGS III LLC1756 114TH AVENUE SE 110 BELLEVUE WA 98004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sauvage, Agnes Seattle, US 1 4
Wine, David Seattle, US 14 392
Yang, Wei Bellevue, US 1193 4487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00