Construction payment management system and method with draw notification features

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9355417
APP PUB NO 20120197790A1
SERIAL NO

13440740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and method for managing a construction payment process. When instructions are executed by a processor, an application server determines a date on which a draw is to occur for a construction project and generates a notification. The notification includes an indication of the date on which the draw will occur and an invitation to initiate a request for payment to be included in the draw. The application server then determines a plurality of participants associated with the construction project to be included in the draw and transmits the notification to the determined plurality of participants. The application server initiates the draw on the determined date and at least one participant of the determined plurality of participants receives a payment in the draw.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXTURA CORPORATION1405 LAKE COOK ROAD DEERFIELD IL 60015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allin, Patrick J Lake Bluff, US 45 716
Cherry, Charles C Glenview, US 40 661
Eichhorn, William H Hinsdale, US 40 662
Niden, Howard L Chicago, US 27 453

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00