Light-water reactor fuel assembly (alternatives), a light-water reactor, and a fuel element of fuel assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9355747
APP PUB NO 20110311016A1
SERIAL NO

13139677

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A 17×17 jacketless fuel assembly for a PWR-type light-water reactor uses thorium as the fuel. The fuel assembly has a square shape in the plan view, a seed region, a blanket region that encircles it, an upper nozzle, and a lower nozzle. The fuel elements of the seed region re arranged in the rows and columns of a square coordinate grid and have a four-lobed profile that forms spiral spacer ribs along the length of a fuel element. The blanket region contains a frame structure within which a bundle of fuel elements made from thorium with the addition of enriched uranium is positioned. The blanket region fuel elements are arranged in the two or three rows and columns of a square coordinate grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THORIUM POWER INC1600 TYSONS BLVD SUITE 500 MCLEAN VA 22102

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bashkirtsev, Sergey M Moscow, RU 3 20
Kevrolev, Valery V Moscow, RU 1 4
Kuznetsov, Valentin F Moscow, RU 1 4
Morozov, Alexey G Moscow, RU 3 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00