Electrical connector with ground frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9356401
SERIAL NO

14591998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical connector includes a housing, contacts, ground shields, and a ground frame. The housing extends between a front end and an opposite rear end. The front end is configured to be mated with a mating connector. The contacts and ground shields are held by the housing. The ground shields at least partially surround the contacts to provide electrical shielding for the contacts. The ground frame has a first side coupled to the rear end of the housing and a second side facing the circuit board. The contacts have terminating ends and the ground shields have mounting ends. The terminating ends and the mounting ends extend from the rear end of the housing through the ground frame for termination to the circuit board. The ground frame engages the ground shields to electrically join the ground shields.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TE CONNECTIVITY CORPORATION;TYCO ELECTRONICS (SHANGHAI) CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cherok, Peter Dillsburg, US 1 50
Davis, Wayne Harrisburg, US 9 119
Horning, Michael James Lancaster, US 28 252
Huang, Liang Chengdu, CN 131 600
Morgan, Chad Carneys Point, US 16 461

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00