Differential forwarding in address-based carrier networks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9356862
SERIAL NO

14478001

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to enabling differential forwarding in address-based carrier networks such as Ethernet networks. There is described a method of and connection controller for establishing connections (76, 77) in a frame-based communications network comprising nodes (71-75 and 78) such as Ethernet switches. The connections are established by configuring, in various of the nodes, mappings for forwarding data frames, such as Ethernet frames. The mappings are from a combination of a) a destination (or source) address corresponding to a destination (or source) node (73) of the connection and b) an identifier, such as a VLAN tag. The mappings are to selected output ports of the various nodes. By using the combination of destination (or source) address AND identifier, the mappings enable data frames belonging to different connections (76, 77) to be forwarded differentially (ie forwarded on different output ports) at a node (75) despite the different connections having the same destination node. This enables flexibility in routing connections and the ability to perform traffic engineering.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RPX CLEARINGHOUSE LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allan, David Ottawa, CA 113 3768
Ashwood-Smith, Peter Gatineau, CA 120 3282
Bragg, Nigel Cambridgeshire, GB 72 3675
Brueckheimer, Simon London, GB 24 1056
Friskney, Robert Essex, GB 26 1112
Parry, Simon Essex, GB 22 1000

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00