Furniture member power mechanism with selectable lift movement and zero gravity position

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9358167
APP PUB NO 20150076891A1
SERIAL NO

14227837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A furniture member has a base frame including first and second frame members each having a first or second frame support tube. A mechanism includes a motor connected to the base frame and a torque tube connected to first and second support brackets and the motor. A stiffening tube assembly has first and second side stiffening tubes, the first frame support tube connected to the first side stiffening tube and the second frame support tube connected to the second side stiffening tube. Multiple rotation links include a first set connected to the first frame support tube and the first side stiffening tube, and a second set connected to the second frame support tube and the second side stiffening tube. The rotation links allow mechanism rotation to a forward lift position by motor operation displacing the torque tube and thereby forwardly rotating and lifting the side stiffening tubes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LA-Z-BOY INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harwood, Eric B Toledo, US 14 263
Hegedus, Alexander M Toledo, US 7 61
LaPointe, Larry P Temperance, US 145 2938

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00