Method of forming a nano-structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9359195
APP PUB NO 20130171418A1
SERIAL NO

13822075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Nano-structure includes a substrate and a non-oxidized portion of a metal layer (having an expansion coefficient, during oxidation, that is more than 1) on the substrate. An oxide layer is formed on the non-oxidized portion. A plurality of metal oxide nano-pillars is grown from the oxide layer. Each nano-pillar is grown through a plurality of pores defined in a template. A space is defined between adjacent nano-pillars. A continuous metal oxide cap layer is over the nano-pillars and over, but not in, the space between adjacent nano-pillars. The cap layer is formed from end portions of the nano-pillars that merge together over a template surface. The cap layer is in contact with all of the nano-pillars. The oxide layer, the nano-pillars, and the oxide cap layer are formed from anodization of portions of the metal layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fuller, Anthony M Corvallis, US 46 79
Mardilovich, Peter Corvallis, US 149 4981
Wei, Qingqiao Corvallis, US 33 1392

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00