Coal fired boiler plant and coal drying method for coal fired boiler plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9360211
SERIAL NO

13613635

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Coal is properly dried and the efficiency of a boiler is increased while suppressing any reduction in efficiency of the boiler and the generation of hydrocarbon gas components. Employed are a coal dryer that dries coal, a boiler in which the coal that is dried in the coal dryer is mixed with air for combustion and burned, an air heater that heats the air for combustion that is supplied to the boiler using combustion exhaust gas discharged from the boiler, a precipitator that collects dust included in the combustion exhaust gas, a desulfurization plant that performs a desulfurization process on the combustion exhaust gas, and heat recovery equipment that heats a heating medium using the combustion exhaust gas. The coal dryer dries the coal using the heat energy of the heating medium that has been heated in the heat recovery equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honjo, Shintaro New York, US 56 603
Okamoto, Takuya Tokyo, JP 151 1355
Sugita, Satoru New York, US 77 475

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00