Distributed file system using consensus nodes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9361311
SERIAL NO

14013948

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cluster of nodes in a distributed file system may include; at least two namenodes, each coupled to a plurality of data nodes and each configured to store a state of a namespace of the cluster and each being configured to respond to a request from a client while other(s) of the namenodes are responding to other requests from other clients; and a coordination engine coupled to each of the namenodes. The coordination engine may be configured to receive proposals from the namenodes to change the state of the namespace by replicating, deleting and/or adding data blocks stored in the data nodes and to generate, in response, an ordered set of agreements that specifies an order in which the namenodes are to change the state of the namespace. The namenodes are configured to delay making changes thereto until after the ordered set of agreements is received from the coordination engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WANDISCO, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aahlad, Yeturu Foster City, US 31 468
Parkin, Micahel Sheffield, GB 2 40
Shvachko, Kostantin V Fremont, US 1 0
Sundar, Jagane Saratoga, US 10 234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00