Progressive force strap assembly for use with an orthopedic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9364365
APP PUB NO 20140213947A1
SERIAL NO

14148981

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A progressive strap assembly includes an elongate, inelastic body having first and second ends, and an elastic body having first and second ends, the first end of the elastic body anchored to the second end of the inelastic body. The elastic body is arranged to stretch a plurality of lengths and has a maximum stretchable length. A tension limiter is connected to the first and second ends of the elastic body and is arranged to inhibit a predetermined stretchable length of the elastic body short of the maximum stretchable length.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddressTotal Patents
Össur hf.REYKJAVIK528

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ingimundarson, Arni Thor Gardabaer, IS 132 2523
Omarsson, Bjorn Reykjavik, IS 31 74
Petursson, Valgeir Reykjavik, IS 18 27
Thorsteinsdottir, Hildur Inga Reykjavik, IS 7 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2019
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00