Sample hold circuit, A/D converter, calibration method of the sample hold circuit, and circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9374104
APP PUB NO 20150229320A1
SERIAL NO

14424111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a pipelined A/D converter in which plural stages Stage 1 to Stage N each including an MDAC (i.e., Multiplying DA Converter) are connected. The pipelined A/D converter is configured with a Gain-AMP (12) included in the MDAC for the SPM, MOS transistors (Mx1) and (Mx2) as a differential pair having output ends connected to a sampling capacitor CsI on a subsequent stage, MOS transistors (My1) and (My2) as a load unit connected to the differential pair, a current source (I3) configured to supply a current to the MOS transistors (Mx1) and (Mx2) as the differential pair, and current sources (I1) and (I2) configured to adjust the current flown across the MOS transistors (My1) and (My2) as the load unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASAHI KASEI MICRODEVICES CORPORATION1-1-2 YURAKUCHO CHIYODA-KU TOKYO 100-0006

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyahara, Yuichi Tokyo, JP 9 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00