Methods and systems for detection and notification of blocked rail crossings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9376129
APP PUB NO 20150066255A1
SERIAL NO

14525702

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blocked rail crossing detection and notification system is described. The system includes a processing device, a communications interface communicatively coupled to the processing device and operable for facilitating communications between the processing device and at least one external device, and at least one vehicle detection mechanism placed proximate to a rail grade crossing. The at least one vehicle detection mechanism is communicatively coupled to the processing device and operable to provide signals to the processing device indicative of the presence or non-presence of a vehicle within a defined area surrounding an intersection of a roadway and one or more railroad tracks. The processing device is further programmed to communicate the presence or non-presence of a vehicle along with supporting correlative visual data within the defined area to the at least one external device via the communications interface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZIONS BANCORPORATION N A DBA ZIONS FIRST NATIONAL BANK10 EAST SOUTH TEMPLE SALT LAKE CITY UT 84133

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hilleary, Thomas N Lenexa, US 32 866

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00