Three-phase capacitor formed by two aligned cylinders with overpressure disconnection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9378889
APP PUB NO 20140177124A1
SERIAL NO

13995763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Three-phase capacitor formed by two cylinders where each of the cylinders comprises an outer part which corresponds to a capacitor (1) and (2) while the inner part of each cylinder corresponds to a capacitor (3) and (3′) and which are connected in delta with phases (A), (B) and (C), where each capacitor is separated from the adjacent of each cylinder by means of an insulating material which allows the movement of the inner part with respect to the outer one of each cylinder in case of overpressure, which causes the breakage of the connections made in a particular manner, the breakage of the conductive coating layer (7) which connects armatures (3.1) and (1.2); the breakage of the conductive coating layer (8) which connected armatures (2.2) and (3′.2), the breakage of the connection of connection cable (6) with phase (C), serving as an effective means of protection against internal overpressures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTR ENERGIA S L28320 PINTO MADRID

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nunez-Barranco, Patino Cesar Madrid, ES 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00