Thin-film transistor structure, as well as thin-film transistor and display device each having said structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9379248
APP PUB NO 20140054588A1
SERIAL NO

14113303

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided an oxide semiconductor layer capable of making stable the electric characteristics of a thin-film transistor without requiring an oxidatively-treated layer when depositing a passivation layer or the like in display devices such as organic EL displays depositing and liquid crystal displays. The thin-film transistor structure of the present invention at least having, on a substrate, an oxide semiconductor layer, a source-drain electrode, and a passivation layer in order from the substrate side, wherein the oxide semiconductor layer is a stacked product of a first oxide semiconductor layer and a second oxide semiconductor layer; the first oxide semiconductor layer has a Zn content of 50 atomic % or more as a percentage of all metal elements contained therein, and the first oxide semiconductor layer is formed on the source-drain electrode and passivation layer side; the second oxide semiconductor layer contains at least one element selected from the group consisting of In, Ga, and Zn, and the second oxide semiconductor layer is formed on the substrate side; and the first oxide semiconductor layer is in direct contact both with the source-drain electrode and with the passivation layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kugimiya, Toshihiro Kobe, JP 78 1101
Maeda, Takeaki Kobe, JP 50 390

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 28, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00