Tool systems for implanting prosthetic intervertebral discs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9381098
SERIAL NO

11529824

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described are tools—including distractor, trial, chisel, and inserter—that may be used as a system for implanting a prosthetic intervertebral disc in a spine. The distractor moves vertebrae and may have angled forks optionally offset for visibility with removable jaws optionally matching desired lordotic angles. The trial tool(s) may fit within the distractor forks, include a lordotic angle, and may include a disc portion, an adjustable stop, and a feature to control movement of the disc portion relative to the adjustable stop. The chisel tool cuts grooves in the vertebral bodies, which grooves affix the disc to the vertebrae. The chisel(s) may fit within openings in the trial, where those openings also serve as a guide during the groove-cutting step. The inserter tool, optionally with a movable pusher, is used for inserting the prosthetic disc into the prepared intervertebral disc space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPINAL KINETICS LLC251 LITTLE FALLS DRIVE WILMINGTOM DE 19808

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dolin, Jeffrey J Belmont, US 4 308
Fellenz, Frank Los Gatos, US 5 197
Gittings, Darin C Sunnyvale, US 60 7405
Robinson, Janine C Half Moon Bay, US 38 3213
Stewart, Daren L Belmont, US 23 3199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00