Process for producing phenol

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9382178
APP PUB NO 20160075623A1
SERIAL NO

14787862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a process for producing phenol and cyclohexanone, reaction components comprising cyclohexylbenzene hydroperoxide and an acid catalyst are supplied to a cleavage reaction zone, mixed under mixing conditions effective to combine the reaction components into a reaction mixture and at least part of the cyclohexylbenzene hydroperoxide in the reaction mixture is converted under cleavage conditions to into phenol and cyclohexanone; and a cleavage effluent is recovered from the cleavage reaction zone. The cleavage and mixing conditions are controlled such that the ratio tR/tM is at least 10, where tR is the half-life of cyclohexylbenzene hydroperoxide under the cleavage conditions and tM is the time required after injection of a tracer material into the reaction mixture under the mixing conditions for at least 95% by volume of the entire reaction mixture to attain at least 95% of the volume-averaged tracer material concentration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EXXONMOBIL CHEMICAL PATENTS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coleman, John S Houston, US 26 57
Patel, Bryan A Jersey City, US 28 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00