Method for processing of carbon dioxide contained in an exhaust gas flow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9382388
APP PUB NO 20150018536A1
SERIAL NO

14379645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for processing carbon dioxide contained in an exhaust gas flow. The exhaust gas flow is brought in contact in a drying and cooling chamber with a moistened porous silicate material and admixed aluminum hydroxide and/or hydrated aluminum oxide and/or optionally other metal oxidizers to produce a basic aqueous medium and to destabilize the carbon dioxide, and cooled. The amount of aluminum hydroxide and/or hydrated aluminum oxide to be added is controlled via a continuous pH value measurement, after which the aqueous medium is fed to a subsequent prechamber, which is supplied with material containing oxidizable alkaline earth and/or heavy metal, in which neutralization of the aqueous medium containing ionized carbon occurs. The formed alkaline earth and/or heavy metal oxide is discharged from the prechamber and the aqueous medium containing ionized carbon is then fed to a main chamber equipped with material consisting of and/or containing organic carbon compounds.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMERZIALBANK MATTERSBURG IM BURGENLAND AKTIENGESELLSCHAFTJUDENGASSE 11 MATTERSBURG A-7210

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Philipp, Franz Josef Forchtenstein, AT 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00