Power generating system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9382815
SERIAL NO

13944180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generating system includes a flow dividing structure, a first detector, a flow dividing adjusting valve, a heat accumulator, a heat exchanger and a turbine. The flow dividing structure divides a first heat medium into a first flow path and a second flow path. The first detector detects a flow rate of the first heat medium. The flow dividing adjusting valve opens the second flow path when the flow rate of the first heat medium exceeds a predetermined value. The heat accumulator accumulates the first heat medium via the second flow path and delivers the first heat medium at a temporally leveled flow rate. The heat exchanger transfers heat from the first heat medium to a second heat medium having a lower boiling point than the first heat medium. The turbine rotationally moves by the second heat medium with heat having been transferred by the heat exchanging unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBA1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuya, Osamu Kawasaki, JP 15 89
Hadianto, Mohammad Ashari Yokohama, JP 2 1
Okita, Nobuo Yokohama, JP 24 130
Rodionov, Mikhail Ebina, JP 20 147
Takahata, Kazuo Yokohama, JP 5 3
Takayanagi, Mikio Tokyo, JP 8 35
Taniguchi, Akihiro Yokohama, JP 43 363
Yamashita, Katsuya Tokyo, JP 53 543

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00