Semiconductor device and method of forming bump-on-lead interconnection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9385101
SERIAL NO

14745056

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a semiconductor die with a plurality of composite bumps formed over a surface of the semiconductor die. The composite bumps have a fusible portion and non-fusible portion, such as a conductive pillar and bump formed over the conductive pillar. The composite bumps can also be tapered. Conductive traces are formed over a substrate with interconnect sites having edges parallel to the conductive trace from a plan view for increasing escape routing density. The interconnect site can have a width less than 1.2 times a width of the conductive trace. The composite bumps are wider than the interconnect sites. The fusible portion of the composite bumps is bonded to the interconnect sites so that the fusible portion covers a top surface and side surface of the interconnect sites. An encapsulant is deposited around the composite bumps between the semiconductor die and substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STATS CHIPPAC PTE LTDSINGAPORE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pendse, Rajendra D Fremont, US 158 2906

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00