Solar cell and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 9385261
SERIAL NO

14301183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar cell and a method of manufacturing a solar cell are disclosed. The solar cell includes forming a first doped region of a first conductive type and a second doped region of a second conductive type opposite the first conductive type on a semiconductor substrate of the first conductive type; forming a passivation layer on the semiconductor substrate to expose a portion of each of the first and second doped regions; and forming a first electrode electrically connected to the first doped region and a second electrode electrically connected to the second doped region, wherein the forming of the first and second electrodes includes forming a metal seed layer directly contacting the first doped region and a metal seed layer directly contacting the second doped region, and forming a conductive layer on the metal seed layer of each of the first and second electrodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG ELECTRONICS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choe, Youngho Seoul, KR 49 356
Lee, Sungeun Seoul, KR 61 211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00