Timing phase estimation for clock and data recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9385858
APP PUB NO 20140241478A1
SERIAL NO

13776905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to initialize the phase of the recovered clock signal used in clock-and-data recovery (CDR) circuitry, the normal, on-line CDR processing is disabled. The sum of the absolute values of analog-to-digital converter (ADC) samples are generated for different clock phases over each unit interval (UI) of the analog signal sampled by the ADC for a specified period of time. The phase corresponding to the maximum sum is selected as the initial phase for the recovered clock signal for enabled, on-line CDR processing, which among other things, automatically updates the clock phase to ensure that the ADC samples the analog signal near the center of each UI.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE LIMITED1 YISHUN AVENUE 7 SINGAPORE 768923

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Annampedu, Viswanath Schnecksville, US 52 1374
Malipatil, Amaresh V San Jose, US 21 234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00