Wiring board, electronic component embedded substrate, method of manufacturing wiring board, and method of manufacturing electronic component embedded substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9386697
APP PUB NO 20140293561A1
SERIAL NO

14302946

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wiring board or an electronic component embedded substrate includes a substrate that includes a resin containing a plurality of fillers; and a via that is electrically connected to at least one interconnect provided to the substrate, wherein the via includes a mix area in which metal is provided between the fillers on an inner radial side with respect to the substrate. A method of manufacturing a wiring board or an electronic component embedded substrate includes preparing a substrate that includes a resin containing a plurality of fillers; forming a via formation hole in the substrate; performing an ashing process on at least an inner wall of the via formation hole; and performing electroless plating on the inner wall of the via formation hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK CORPORATIONTOKYO 103-6128

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawabata, Kenichi Tokyo, JP 137 2128
Uematsu, Hiroyuki Tokyo, JP 35 412

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00