Latex for dip molding, composition for dip molding, preparation method of dip molded product, and dip molded product prepared thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9388302
APP PUB NO 20140329956A1
SERIAL NO

14331941

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a latex for dip molding, a composition for dip molding, a preparation method of a dip molded product, and a dip molded product prepared thereby. The latex for dip molding includes a conjugated diene monomer, an ethylenically unsaturated nitrile monomer, and an ethylenically unsaturated acid monomer, wherein the latex further includes sodium methallyl sulfonate as a copolymerizable ionic monomer. A dip molded product having excellent tensile strength, elongation, and touch may be obtained from a composition using the latex according to the present invention, and the generation of limitations, such as non-uniformity of physical properties and difficulties in product management, may be prevented.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Ho Yeul Daejeon, KR 7 56
Han, Jung Su Daejeon, KR 32 198
Kim, Byoung Yun Daejeon, KR 23 220
Kim, Jung Eun Daejeon, KR 86 790
Yang, Seung Hun Daejeon, KR 27 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00