Extendable sleeve for poured concrete deck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9388570
APP PUB NO 20150204088A1
SERIAL NO

14484747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tubular passage for poured concrete decks has an intumescent tube held in a two-part, clamshell base by a bottom clip. A first tube engages the base's top to clamp a funnel shaped, diaphragm seal to the base. The first tube has spaced, radially extending, parallel ridges at predetermined distances from the base. Longitudinal channels separate the ridges. An extension tube has inward extending lugs passing along the channels to engage various ridges when rotated to fix the passage length. The extension engages the base bottom for corrugated deck supports. A cap with repositionable, locating filaments closes either tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RELIANCE WORLDWIDE CORPORATION2300 DEFOOR HILLS ROAD NW ATLANTA GA 30318

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Larry D San Diego, US 41 617
Hart, Dennis L Incline Village, US 30 376
McConnell, Timothy M San Diego, US 7 125
O'Neil, Virgil San Diego, US 38 200
Price, Darrell W Rockledge, US 5 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00