Projector and display control method for projector with orientation correction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9389493
APP PUB NO 20140160443A1
SERIAL NO

14093819

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projector, that projects an image, includes a light source, a liquid crystal panel that modulates light output from the light source and forms an image in response to input image data, a projection optical device that projects the image formed by the liquid crystal panel, a control device that controls the liquid crystal panel, and an acceleration sensor that detects a position of the projector. The control device includes a determination unit that determines whether or not the position detected by the acceleration sensor is a predetermined position, and a correction unit that corrects an orientation of the image data so that a longer side of the image data may coincide with a longer side of an image formation area of the liquid crystal panel if the determination unit determines that the detected position is the predetermined position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakayama, Tetsu Matsumoto, JP 51 620
Tatara, Yoshihiro Shiojiri, JP 51 572

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00