Method for recovering active material from waste battery material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9394585
APP PUB NO 20130323142A1
SERIAL NO

13985003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method of recovering active material from waste battery materials comprises: (1) an electrode material mixture recovery step of separating an electrode from the waste battery material to recover an electrode material mixture including the active material, a conductive material, and a binder from the electrode; (2) an activation agent mixing step of mixing an activation agent including one or more alkali metal compounds with the recovered electrode material mixture; (3) an activation step of heating the obtained mixture to a retention temperature not less than a melting start temperature of the activation agent to activate the active material included in the mixture; and (4) an active material recovery step of recovering the activated active material from a mixture obtained as a result of cooling after the activation step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO CHEMICAL COMPANY LIMITEDFLOOR 18 SUMITOMO TWIN BUILDINGS 27-1 SHINKAWA 2-CHOME CHUO-KU TOKYO 104-8260

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Shingo Tsukuba, JP 57 635
Shimano, Satoshi Tsukuba, JP 19 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00