Reactor vessels with pressure and heat transfer features for producing hydrogen-based fuels and structural elements, and associated systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9395081
SERIAL NO

14589757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Reactor vessels with pressure and heat transfer features for producing hydrogen-based fuels and structural elements, and associated systems and methods. A representative reactor system includes a first reaction zone and a heat path, a reactant source coupled to the first reaction zone, and a first actuator coupled to cyclically pressurize the first reaction zone. A second reaction zone is in fluid communication with the first, a valve is coupled between the first and second reaction zones to control a flow rate therebetween, and a second actuator is coupled in fluid communication with the second reaction zone to cyclically pressurize the second reaction zone. First and second heat exchangers direct heat from products to reactants in the reaction zones. A controller controls the first and second actuators in a coordinated manner based at least in part on a flow rate of the second product from the second reaction zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ADVANCED GREEN INNOVATIONS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McAlister, Roy Edward Phoenix, US 172 1730

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00