Instantaneous unplug of pluggable database from one container database and plug into another container database

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9396220
APP PUB NO 20150254240A1
SERIAL NO

14202091

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pluggable database is transported between a source DBMS and a destination DBMS, in a way that minimizes downtime of the pluggable database. While a copy of the pluggable database is being made at the destination DBMS, transactions continue to execute against the pluggable database at the source DBMS and change the pluggable database. Eventually, the transactions terminate or cease executing. Redo records generated for the transactions are applied to the copy of the pluggable database at the source DBMS. Undo records generated for at least some of the transactions may be stored in a separate undo log and transported to the destination DBMS. The transported pluggable database is synchronized at a destination DBMS in a “pluggable-ready state”, where it may be plugged into the destination container DBMS.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORACLE INTERNATIONAL CORPORATION500 ORACLE PARKWAY MAIL STOP 5OP7 REDWOOD SHORES CA 94065

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jain, Sanket Sunnyvale, US 25 471
Lee, Jaebock Sunnyvale, US 23 726
Lee, Jonghyun San Jose, US 55 288
Li, Yunrui Fremont, US 54 1049
Minh, Chi Cao San Mateo, US 8 190
Rajamani, Kumar San Ramon, US 41 940
Ravipati, Giridhar Foster City, US 21 482

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00