Directed route load/store packets for distributed switch initialization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9397851
APP PUB NO 20150139239A1
SERIAL NO

14572507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for transmitting a packet from a source switch module to a destination switch module. Embodiments receive, at a first port of a first switch module, a packet that includes (i) path information specifying a route to the destination switch module, (ii) a set of load/store operations to be executed by the destination switch module and (iii) return path information specifying a route from the destination switch module to the source switch module. Upon determining that the first switch module is the destination switch module, the set of load/store operations are copied from the received packet into an execution buffer for automatic execution. Once the set of load/store operations are executed, embodiments transmit the packet to a second switch module using the first port on which the packet was received.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Flynn, William T Rochester, US 30 330
Kirscht, Joseph A Rochester, US 48 478
Walk, Bruce M Rochester, US 62 1403

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00