Manufacturing method for a glass film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9399595
APP PUB NO 20120125967A1
SERIAL NO

13296565

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method for a glass film includes a cleaving step of dividing a glass film having a band shape into a product glass portion and an unnecessary glass portion, and a collecting step of sequentially shattering the unnecessary glass portion, and collecting the shattered unnecessary glass portion. The cleaving step is followed by vibration regulating processing of regulating vibrations of the unnecessary glass portion in a thickness direction thereof, the vibration regulating processing being executed in at least one location in the longitudinal direction of the unnecessary glass portion, and the collecting step being executed on a downstream side of the at least one location of the vibration regulating processing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON ELECTRIC GLASS CO LTD7-1 SEIRAN 2-CHOME OTSU-SHI SHIGA 520-8639

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuta, Takaya Otsu, JP 5 98
Matsumoto, Yasuhiro Otsu, JP 112 1013
Mori, Koichi Otsu, JP 114 817
Nakabayashi, Akio Otsu, JP 7 66
Nishijima, Koji Otsu, JP 7 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00