Method of making a crosslinked overmolded assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9403327
APP PUB NO 20160032067A1
SERIAL NO

14503917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for making a crosslinked assembly includes steps of: selecting a desired performance parameter for a molded assembly of a first polymeric component and a second polymeric component bonded to the first polymeric component, controlling a first crosslinking percentage for the first polymeric component and a second crosslinking percentage for the second polymeric component independently to provide the desired performance parameter for the assembly, orienting the assembly at an angle between an orientation axis of the assembly and a electron beam direction, exposing the oriented assembly a predetermined number of times (N) to the electron beam operable to deliver a predetermined amount of radiation (R) in the electron beam direction providing a total radiation exposure proportional to (N×R) providing the first component crosslinking percentage and the second component crosslinking percentage, the resulting assembly having the desired performance parameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MERCURY PLASTICS LLCP O BOX 989 15760 MADISON ROAD MIDDLEFIELD OH 44062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rowley, William W Chagrin Falls, US 38 1261

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00