Electrically driven dump truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9403526
APP PUB NO 20140095006A1
SERIAL NO

14123911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle control device 50, a controller 100, an inverter control device 30 and a steering control device 32 constitute a control device that executes control to give a yaw moment to a vehicle 1 so as to make the vehicle 1 travel while meandering around the center of trolley wires 3R and 3L based on image information acquired by a camera 15. The control device converts an image acquired by the camera 15 into coordinate information, calculates at least one representative point of the vehicle 1 and at least one target point situated on the trolley wire 3R/3L based on the coordinate information, sets a fluctuating point which fluctuates with reference to the target point, and executes control to give a yaw moment to the vehicle 1 so that the representative point approaches the fluctuating point. With this configuration, uneven wear of the sliders can be prevented and the operating load on the driver during the trolley traveling can be lightened considerably.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO 110-0015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakajima, Kichio Isesaki, JP 34 1308
Saito, Shinjiro Kasumigaura, JP 34 648

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00