Continuous polymerization device, method for producing polymer composition, and injection valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9403922
APP PUB NO 20160009831A1
SERIAL NO

14764890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous polymerization apparatus uses at least a first reactor and a second reactor (10, 20). Each of the reactors (10, 20) comprises a supply port (11a, 21a) and an effluent port (11b, 21b). The supply port (11a) of the first reactor (10) is connected to supply sources (1, 3) of a raw material monomer and a polymerization initiator, and the effluent port (11b) thereof is connected to the supply port (21a) of the second reactor (20) by a connection line (15a). The connection line (15a) is combined with a replenishing line (15b) through an injection valve (50) at a combining part. The injection valve (50) comprises, in a full closure state thereof, a clearance that may cause a fluid comprising at least the raw material monomer to flow from the replenishing line (15b) to the connection line (15a).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO CHEMICAL COMPANY, LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishitani, Akira Ehime, JP 3 22
Sumida, Masakazu Ehime, JP 9 15
Yamazaki, Kazuhiro Ehime, JP 57 447

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00