Fluororubber composition and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9403954
APP PUB NO 20140228482A1
SERIAL NO

14346156

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a fluororubber composition able to produce a crosslinked fluororubber article that exhibits not only heat resistance, but also excellent mechanical properties at high temperatures, and a method for producing same. The fluororubber composition contains: a fluororubber (A); and carbon black (B), wherein when the aforementioned fluororubber composition is immersed for 160 hours in an extraction solvent of acetone and hexane at an acetone:hexane mass ratio of 42.29:57.71 at 40° C. and an extraction residue that is not extracted and remains as a solid is separated from the aforementioned extraction solvent and dried and then the dry weight of the extraction residue is measured, the quantity of a solvent-insoluble polymer is not lower than 5%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doi, Michiko Settsu, JP 9 36
Fukuoka, Shoji Settsu, JP 22 185
Kadowaki, Yuu Settsu, JP 6 25
Kitaichi, Masanori Settsu, JP 30 293
Ota, Daisuke Settsu, JP 50 297
Taeda, Mayuko Settsu, JP 15 80
Ueda, Akinori Settsu, JP 15 71
Yamamura, Kazuhiro Settsu, JP 16 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00